Voltsteering
Create account + free 30-day pilot
ONLINE DEMO — sample project

12 MW PV Farm Skaryszew

This is what a programme portfolio looks like in Voltsteering after the initiation phase (lead → AI Architect → conversion). All figures from a real Polish benchmark.

CAPEX
42.0 M PLN
OPEX/yr
630 k PLN
IRR
11.2%
NPV (25y, 8% disc)
63.8 M PLN
Planning (AI)Materials (BOM)TimelineRisksFinancing

💰 Financing — real-time metrics

EBITDA yearly
3.57 M PLN
ROI lifetime
338%
LCOE
0.32 PLN/kWh
Payback
11.8 yrs

CAPEX

42 000 000 PLN
  • Q.Cells 540W panels (24,000 pcs)21 600 000 PLN
  • SMA 1.5 MW inverters (8 pcs)6 400 000 PLN
  • Mounting structure + installation6 000 000 PLN
  • DC + AC cabling + transformer3 800 000 PLN
  • PB/PT design + grid connection application800 000 PLN
  • Monitoring + SCADA400 000 PLN
  • 8% reserve (contingency)3 000 000 PLN

OPEX (yearly)

630 000 PLN
  • O&M service (1.5% CAPEX)630 000 PLN
  • Insurance (0.3% CAPEX)125 000 PLN
  • Land lease (12 ha × 7k)84 000 PLN
  • SCADA monitoring + communication48 000 PLN
  • Inspections, UDT audit24 000 PLN
AI Architect — sample answer
Claude Sonnet 4.5 · with source citations and confidence level

Question: Is a CAPEX of 42 M PLN for a 12 MW PV realistic?

Yes, a CAPEX of 42 M PLN for a 12 MW PV (= 3.5 M PLN/MW) is in line with the Polish benchmark. The structure looks complete:

  • Panels 51% (typically 45-55%)
  • Inverters 15% (typically 12-18%)
  • Structure + installation 14% (typically 10-15%)
  • Remainder (cabling/design/monitoring/reserve) 20%
🟢 Confidence: HIGHBenchmark from 50+ PV projects in PL 2024-2026.
💡 Recommendation (not a decision): Check whether the BOM contains all items. The decision is on the human side — approve manually.
📎 4 sources
  • portfolio.estimatedCapexPln = 42 000 000 PLN
  • portfolio.targetMetrics.mw_el = 12 MW
  • TYPICAL_FINANCIAL_DEFAULTS.pv.capexPerMwPln = 3 500 000 PLN/MW
  • Result: 3.5 M PLN/MW = 100% benchmark

⚔ Voltsteering vs Excel / Asana / Monday

Why Voltsteering costs more than Asana — because it understands the energy domain

AreaExcel / FoldersAsana / MondayVoltsteering
Tasksmanually
Schedulemanually
RES documentschaoticallygenericdomain-specific (PB/PT/PZT)
Project risksmanuallypartiallyP×I + risk register
URE / DSO processes✅ built-in grid connection wizard
AI on documentsgenericdomain-specific (9 PL assistants)
Project portfoliohardpartialdedicated dashboard
URE / EFP auctions✅ Auction Assistant
Grants (NFOŚiGW/RPO)manually✅ Banking Assistant
Audit log compliancebasic✅ ISO 27001 ready

30-day pilot — with a measurable result

We will onboard 3-5 of your projects, organise your documents, set up the schedule, the risk register and the portfolio dashboard. After 30 days, a report: how much time was saved, how many gaps were found.

ICP: PV / BESS in PL · 10+ active projects · currently Excel + emails